Water Insulation Products
BITUMAX 2K
Technical Data Sheet Material Safety Form
POLYMER MODIFIED BITUMEN RUBBER BASED, TWO-COMPONENT, WATERPROOFING MATERIAL 

Product Description:
Cement and polymer modified bitumen rubber-based, two-component, highly elastic, thick waterproofing material.

It is suitable for TS EN 15814 W1

Public Works Pos No: 04.626/07E

Areas of Use:
In foundations and shear walls,
In retaining walls,
Against ground moisture on underground car parks and garden terraces,
In the protection and insulation of structures and structural elements exposed to leakage water, temporary and permanent water pressure,
It is used for bonding insulation and drainage boards. 

Features:
It is easily prepared and applied.
It can be applied with a brush, trowel or spray machine.
It adheres well to the applied surface.
It creates a seamless complete coating.
It has crack bridging feature.
Does not contain solvent and is environmentally friendly.

Technical Specifications:
Structure of the Material:
Component A: Modified Bitumen Emulsion
Component B: Dry Mix with Special Cements
Appearance: Brown (Black when Dry)
Application Temperature: + 5ºC to + 30ºC
Service Temperature: -20 C to + 80 C
Rest Time of Mortar: 3-5 min.
Using Time: ~ 1 hour
Drying Time: Min 24 hours
Contact with Water: 48 hours
The above values are given for +23 ºC and 50% relative humidity.

Pre-Application Preparation: 
Make sure that the application surface is cured and solid.
The surface to be applied should be free from paint, oil, dust etc. must be cleaned from materials.
Plasters that do not adhere well on the application surface should be removed, and any defects should be corrected with Tamires repair mortars.
Active water leaks should be filled with suitable products.
The corners and edges should be chamfered with a radius of at least 4 cm.
The application surface should be primed before the application.


Application
The powder component is added to the liquid component and mixed with a medium-speed mixer until a homogeneous mixture is obtained. The mixed material should be consumed within about 1 hour.
Primer can be made by diluting the liquid component of the product at 1/5 ratio. The material should be distributed evenly with a suitable brush and applied without allowing material accumulation on horizontal surfaces. The primer should be allowed to dry and then the actual application should be started. (Primer Consumption: 0.25 kg / m²)
The two-component coating material obtained by mixing homogeneously should be applied to the surface with a brush, trowel or spray in at least 2 layers.
After the first coat is applied, the second coat must be fully dried for the second coat application.
The second floor should be made perpendicular to the first floor. Foundation excavation should not be covered until complete drying.
After the coating is protected with appropriate heat insulation and drainage boards, the filling should be done.

Warnings
Application should not be made during rain or in situations where it is likely to rain. It should be protected from frost, sun and strong wind for the first 24 hours after the application.
The application should be made on the part of the building that comes into contact with water.
Since the curing of the material will be slower in cold weather, it should be ensured that the first layer is completely dry before the second layer is applied.
It is necessary to pay attention to the application temperature and apply between + 5ºC and + 30ºC.
Wash all tools and application equipment with clean water immediately after use.
Solvent cleaning can be used for dried material.

Consumption
Against moisture: 3,0-4,0 kg / m²
Against unpressurized water: 4.0-5.0 kg / m²
Pressurized water: 5.0-6.0 kg / m²
The amount of consumption is the values calculated theoretically in the laboratory environment; We recommend that consumption control sample application be made before the application.

Packing
A Liquid Component: 22 kg
B Powder Component: 8 kg

Storage and Shelf Life: 
It should be stored in its unopened original package, in a cool and dry environment, away from direct sunlight and away from frost.
Pallets should not be placed on top of each other.
It is 12 months from the date of production under suitable storage conditions.
Opened packages should be stored under suitable storage conditions by tightly sealing unless the ingredients are mixed and used within one week.

Safety Advices: 
For more detailed information, please refer to the Safety Data Sheet.

Responsibility
The application instructions and technical values given in this technical document are based entirely on our scientific and practical knowledge. These values may vary depending on the ambient conditions. Allmax Construction Chemicals reserves the right to make changes in products in line with technological developments. Allmax Yapı Kimyasalları cannot be held responsible for the results that may arise out of written recommendations regarding where and how the product will be used and / or due to incorrect use. Therefore, when using Allmax Construction Chemicals products, make sure that you use the right product in the right place. Allmax Construction Chemicals is only responsible for the quality of the product.