Thermal Insulation Products
WHAT ARE THE IMPORTANT POINTS DURING BONDING THERMAL INSULATION LEVHALARININ?
Pasted sheets should be secured firmly to suppress a good adhesion, 1 day then mechanically dowels should be kept. The corners of the heat insulation panels of dowels and 2 in the middle region of m2 6 should be discarded.